Our refund and change policy is short on legalese and biased toward making it right. Here’s the practical version.
Cancelling before install
See how to cancel a quote. The short version: free until we order materials for your job, 30% of the pre-tax subtotal after that.
Change orders (during or after install)
Anything that adds or removes scope vs the accepted quote is a change order. Mid-install, we write the change order on paper, you sign, and we proceed — or you decline and we wrap up the original scope. Post-install, a change order is a new quote.
If the install isn’t right
You see something wrong — a flickering light, or the wrong charger model installed. Tell us. The path:
Message us in your portal or call — the same day if possible.
We come back to fix it at no charge if the issue is our work, our parts, or our materials.
If our work damages your property, tell us and we’ll deal with it under our Terms and our insurance. Drywall patching and painting are not part of our work.
This is covered by our 1-year workmanship warranty (see post-install support).
If you’re unhappy with the product itself
Products carry the manufacturer’s own warranty, and we help you with the claim. In the first year after install, replacement labour is free; after that, it’s billed at our normal rate.
Full refunds
If a fix isn’t practical, ask in writing and we’ll review a refund case by case.
Disputes we can’t resolve
The Electrical Safety Authority handles safety and code-compliance concerns. Consumer Protection Ontario handles general consumer complaints. We hope it never comes to that.