Skip to main content

Electrical Panel UpgradesRichmond Hill & Toronto

Enough power for
what you plug in next.

* A 60A or 100A panel runs out before an EV charger, a heat pump and a hot tub do. We size the replacement, pull the ESA permit, book the utility disconnect and hand you the inspection.

An Eaton panel Copper Bee installed on a plywood backboard, its door open on hand-labelled breakers, the branch circuits strapped and run in overhead.
200A upgrade from$1,999 installed + HST
Every upgrade includes
  • New panel + main breaker
  • ESA permit & inspection
  • Utility coordination
Our panels

How far does it have to go?

What separates a $1,299 job from a $5,149 one is how much of the service changes — the panel, the meter base, or the supply from the pole as well. Every price below includes the panel, installation, the ESA permit and the inspection.

The panel is full, the service is fine

The breaker box is out of spaces or out of date, but the meter and the supply from the street stay exactly as they are.

100A Panel Upgrade

The smallest change that clears a 60A fuse panel.

Panel-only change — meter base unchangedESA permit includedModern 100A main panel

100A will not carry an EV charger and a heat pump together. If both are on the list, go to 200A once rather than twice.

$1,299installed + HST
More info
200A Panel Upgrade

The default. Room for an EV charger, a heat pump, and whatever comes after them.

Panel-only change — meter base unchangedESA permit includedModern 200A main panel

Covers the panel only. Whether your meter base and the supply from the street can carry 200A is a site question, and we confirm it before quoting.

$1,999installed + HST
More info
The meter base has to change too

A new panel and a new meter base. The supply from the street stays exactly where it is, overhead or buried.

100A Panel + Meter Base Upgrade

A new panel and a new meter base, with the supply from the street untouched.

Existing hydro supply reusedModern 100A main panelNew meter base

The meter has to come off, so the utility books the day.

$2,099installed + HST
More info
200A Panel + Meter Base — Underground Service

The full 200A upgrade for a home fed from underground.

Underground service entranceModern 200A main panelNew meter base

The buried cable belongs to the utility. If theirs is undersized, replacing it is their job and their schedule.

$2,999installed + HST
More info
The service comes down from the pole

The supply itself gets replaced — on a clevis where the roofline allows it, on a new mast where it does not. Either way the utility books a power-off day.

100A Panel + Meter Base + Overhead Service with Clevis

A 100A service where the supply comes in on a clevis rather than a mast.

New overhead service supply on a clevisModern 100A main panelNew meter base

The clevis and the wire from the pole both get replaced, so the utility has to disconnect and reconnect.

$3,249installed + HST
More info
100A Panel + Meter Base + Overhead Mast Service Upgrade (Bungalows)

A bungalow, where the roof is too low to bring the supply in without a mast.

New overhead service mast & supplyBuilt for single-storey bungalowsModern 100A main panel

A mast is the bigger of the two overhead jobs, which is why this costs more than the 200A clevis version below it.

$4,149installed + HST
More info
200A Panel + Meter Base + Overhead Service with Clevis

A 200A service where the supply comes in on a clevis rather than a mast.

New overhead service supply (side of house)Modern 200A main panelNew meter base

A power-off day booked with the utility. Plan on the house being dark for most of it.

$3,999installed + HST
More info
200A Panel + Meter Base + Overhead Mast Service Upgrade (Bungalows)

The full 200A service change, with a new mast.

New overhead service mast & supplyBuilt for single-storey bungalowsModern 200A main panel

A power-off day booked with the utility. Plan on the house being dark for most of it.

$5,149installed + HST
More info
You just need more circuits

Nothing is wrong with the service; you have simply run out of spaces. A sub-panel adds circuits without touching the meter.

Schneider Homeline 100A Sub-Panel
$1,149installed + HST
More info
Request a quote
How it works

From quote to upgraded.

The power is off for a few hours for a panel swap, and for most of a day when the meter base or service changes too. The utility picks the date. Everything either side of it — the permit, the disconnect, the inspection — is ours to chase.

Photograph: Panel replacement — GTA

  1. We review your photos

    A licensed electrician reviews your current panel, wiring, and what you need to add — then confirms your price. No obligation.

  2. We pull the permit

    ESA permit application, utility disconnect request — we handle all the paperwork.

  3. Panel replacement

    Licensed electricians swap your panel, reconnect every circuit, and test everything.

  4. ESA inspection

    We schedule the ESA inspection and hand you the certificate. Your home is code-compliant.

A new Eaton panel Copper Bee installed on a plain white wall, its door swung open on a column of hand-labelled breakers.
Panel replacement — GTA
5 out of 5 stars

“Very glad I asked them for help”

Xin ZhaoPanel troubleshooting and new lights,
Read it on Google(opens Google Maps)

The review in full

Copper Bee helped me troubleshoot an electrical problem with my main panel and installed some new lights at my place as well. Very glad I asked them for help

Why it matters

Old panels can’t keep up with modern life.

Your panel is the bottleneck

EV chargers, heat pumps, hot tubs, and modern kitchens draw more power than older panels were designed for. A 200A upgrade removes the limit. In Richmond Hill, where we’re based, most houses built from the 1980s to 2015 still run on the 100 A they came with.

Safety isn’t optional

Older panels can have outdated breakers, corroded bus bars or undersized wiring. We install the new one to current electrical code.

Breakers trip frequently

If you can't run the dryer and microwave at the same time, your panel is overloaded. A 200A upgrade eliminates the problem.

Adding an EV charger or heat pump

Level 2 EV chargers need 40–60A. Heat pumps need 30–50A. If your panel can't spare it, you need an upgrade.

Home is 20+ years old

Panels from the 1990s and earlier weren't built for today's electrical loads. Upgrading now prevents problems later.

Planning a renovation

Kitchen, basement, or addition? A panel upgrade during renovation is cheaper and easier than doing it separately.

Comparison

100A vs 200A panel.

Many GTA homes built before 2000 still have 100A panels. The table compares them with 200A.

See the numbers
Total capacity
100A100 amps
200A200 amps
EV charger ready
100AOften, with load management
200AYes
Heat pump compatible
100ATight
200AYes
Future-proof
100ALimited
200ARoom to grow
Supports hot tub / sauna
100ARarely
200AYes
Home resale value
100ANeutral
200AA selling point

Treat this table as a rough guide. What your panel can carry depends on the whole house — heating, cooking, the dryer, air conditioning — and we size your upgrade from that load under Rule 8-200 of the Ontario Electrical Safety Code.

200A is the standard for new construction in Ontario. Upgrading now means your panel is ready for anything.

Get a Free Quote
FAQ

Panel upgrade questions.

Still have a question?Browse the Help Center

Our 200A upgrades run $1,999 to $5,149 plus HST, with the ESA permit and installation. New panel and main breaker. Existing breakers reused where compatible; new breakers quoted separately. Your utility's fee to disconnect and reconnect power is not included: when the utility charges one, we bill it at cost plus 10%. Where you land depends on whether you also need a new meter base or overhead service work. The quote says which.

Get a quote

Common signs: breakers tripping under normal load, flickering lights when major appliances cycle, scorch marks on the panel, a 60A or 100A service in a home you want to add an EV charger / heat pump / hot tub to, or a Federal Pacific / Stab-Lok panel (which many insurers won’t cover). Our Panel Calculator can confirm whether your existing service supports your planned loads.

Run the calculator

200A is the default for most homes in 2026 because it future-proofs you for EV chargers, heat pumps, induction stoves, and electric water heaters. 100A is fine for smaller homes with gas heating and no plans for EVs. We always recommend the size based on Rule 8-200 of the Ontario Electrical Safety Code, not a sales target.

A straightforward residential service upgrade is a one-day job. The power is off for a few hours when only the panel changes, and for most of the day when the meter base or the service changes too. The utility sets the disconnect date; we book it, run the new panel, terminate every circuit and stay for the ESA rough-in.

No. The ESA permit fee is included in our quoted price — you never see a separate bill from ESA. Permit and inspection included. Anything the inspector flags in our work is fixed free; existing issues are quoted first.

Sometimes — older meter bases that are still in good condition and rated for the new amperage can stay. But many 60A and 100A homes have meter bases that need replacing alongside the panel; hydro will not energize a 200A service to a 100A meter base. We tell you which case is yours from the photos you send of your meter base and panel.

Get started

Your project starts
with a few questions.

If you know what you need

Pick the work and answer a few questions. A licensed electrician prices it and replies — installation and ESA permit included, no separate labour charge.

Get a Free Quote
If you would rather talk it through

Call and speak to an electrician, not a call centre. Nothing is booked and nothing is charged until you have seen the price.

(647) 890-4747
ECRA/ESA licensed contractor #7019043 · Insured · Richmond Hill, Newmarket, Aurora, Vaughan, Markham and Toronto · Service area

Helpful articles

Short answers to the questions that come up before a job is booked.

Help Center
(647) 890-4747Get a Free Quote